Temecula VCP Project

Project Description:

Total quantity pipe utilized:   3000’ 24’’ - 5000’ 15”

 

24” depth avg. 30’-31’ deep

15” depth avg. 20’ deep

Slope on 24” .0010

Slope on 15” .0015

Prior to digging trench for 24” the area was excavated 50’ wide and 12’ deep with a Komatsu PC600.  The balance was dug with a 48” bucket.

15” pipe was dug with a 36” bucket.  All pipe was a rock encasement.

Location:   Temecula, CA

Engineers/Contractors Involved:

             Design Engineer: Rick Engineering

           Contractor:  Double D Pipeline

Date of Completion:   14 Weeks

 